datum measurement error where the specified measured quantity value is zero
datum measurement error where the specified measured quantity value is zero
NOTE Zero error should not be confused with absence of measurement error.
ANNOTATION (informative) [2 December 2014] Here "datum measurement error" can be replaced by "datum error" and "measured quantity value" can be replaced by "measured value" without ambiguity: "datum error where the specified measured value is zero".